Across the retained records at this address: 1 permit record, 0 planning filings and 0 application records. Source dates run from Sep 24, 2026 to Sep 24, 2026.
Matches use recorded street-address fields. They do not establish parcel boundaries, unit identity or one combined project. Each event retains its source's date meaning.
Building and development
303 East Wacker Amenity Repositioning
303 E WACKER DR
The repositioning plan was to transform two mechanical spaces on floors 29 and 30 into a tenant floor and amenity lounge. The fitness-center design includes a Ninja Warrior-inspired course, studio space, and locker rooms. [1]
Floor conversion
The repositioning plan targets two mechanical spaces on floors 29 and 30 for conversion into a tenant floor and lounge. [1]
Fitness center
The new fitness-center design centers on a Ninja Warrior-inspired course and includes cardio and strength equipment, studio space, and locker rooms. [1]
Development team
Roles below relate to the development phases shown. Contractors for individual permits are listed with those permits.
Find available applications started within the past three years at this street address. Results may be incomplete. Applications without a listed start date appear as undated; check the official portal for current details.
Pending and recently issued applications have not been checked here yet.
1 distinct permit · 0 planning filings · 0 applicationsLatest source date first · undated records last
Matches use the source's exact street fields or a literal planning address. They do not establish parcel, unit or project identity. Ranges and multiple-address planning filings are excluded from automatic matching. Each row shows its source-date meaning and separate check time. Work types follow source wording; missing or mixed descriptions remain unclear. Statuses are the latest facts checked here, not reconstructed statuses on the event date. Source actions and permit dates do not establish construction start or completion.
Property timeline
Issued / ready to issue
101087230Permit
Building work
Work described: Building work
Latest checked status: ACTIVE
Exact source street fields · Checked Nov 2, 2026, 9:01 a.m. ET
Planning rows link to the City Clerk, ADU or Plan Commission source; their checked scope is shown on Planning. Application rows link to the public status portal and retain its separate date meanings. Permit source: City of Chicago Building Permits ↗. Queries cover available source filings from January 1, 2006, with up to 5,000 newest records. Voided/revoked permits are excluded by the source. Historical lookups stay separate from daily alerts and do not expand citywide coverage.