Plan Commission hearing listed; decision not collected
5050 S Kedzie Ave
Filings at this exact Chicago street address.
Across the retained records at this address: 1 permit record, 3 planning filings and 7 application records. Source dates run from Dec 18, 2023 to Sep 23, 2026.
Matches use recorded street-address fields. They do not establish parcel boundaries, unit identity or one combined project. Each event retains its source's date meaning.
Recent collected filings appear below. Load the source history to research earlier activity.
Free account · five lookups per hour
Permit applications at this address
Export applications CSV ↓Find available applications started within the past three years at this street address. Results may be incomplete. Applications without a listed start date appear as undated; check the official portal for current details.
7 exact-address applications found · 7 broader search results checked · Nov 2, 2026, 11:59 a.m. ET
Sign in to check applications →Review details and blank issue dates do not establish project availability. Open the official status portal ↗
Planning filings at this street address
The literal street address matches. This does not establish the same project, parcel, or unit.
Plan Commission hearing listed; decision not collected
90-Final · Passed as Substitute
An address can contain separate jobs or units; these filings are not automatically treated as one project. Dates mean issued / ready to issue. They do not establish construction start, completion, available bids, or work quality. Reported estimates are not added.
Filings by source date
Source status: Active
Work description & named contractors
Demolition
APD ELECTRIC, INC. · Contractor-Electrical
LEVEL DEVELOPMENT LLC · Contractor-General Contractor
CIESLA CONSTRUCTION INC. · Masonry Contractor
TRUSTY PLUMBING, INC. · Contractor-Plumber/Plumbing
INDOOR AIR HVAC INC · Contractor-Ventilation
Planning rows link to the City Clerk, ADU or Plan Commission source; their checked scope is shown on Planning. Application rows link to the public status portal and retain its separate date meanings. Permit source: City of Chicago Building Permits ↗. Queries cover available source filings from January 1, 2006, with up to 5,000 newest records. Voided/revoked permits are excluded by the source. Historical lookups stay separate from daily alerts and do not expand citywide coverage.